Kód: 06809273
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving av ... celý popis
1681 Kč
Potřebujete více kusů?Máte-li zájem o více kusů, prověřte, prosím, nejprve dostupnost titulu na naši zákaznické podpoře.
Nákupem získáte 168 bodů
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.
Zařazení knihy Knihy v angličtině Technology, engineering, agriculture Civil engineering, surveying & building Building construction & materials
1681 Kč
Osobní odběr Praha, Brno a 12903 dalších
Copyright ©2008-24 nejlevnejsi-knihy.cz Všechna práva vyhrazenaSoukromíCookies
Nákupní košík ( prázdný )