Risk-Based Decision Model for Determining the Applicability of an Earned Value Management System in Construction / Nejlevnější knihy
Risk-Based Decision Model for Determining the Applicability of an Earned Value Management System in Construction

Kód: 08241164

Risk-Based Decision Model for Determining the Applicability of an Earned Value Management System in Construction

Autor Mark D Workman

New policy mandated by the Undersecretary of Defense for Acquisition, Technology and Logistics has lowered the dollar thresholds of contracts requiring earned value management (EVM). This policy directed that a risk-based decision ... celý popis

1646


Skladem u dodavatele
Odesíláme za 14-18 dnů
Přidat mezi přání

Mohlo by se vám také líbit

Darujte tuto knihu ještě dnes
  1. Objednejte knihu a zvolte Zaslat jako dárek.
  2. Obratem obdržíte darovací poukaz na knihu, který můžete ihned předat obdarovanému.
  3. Knihu zašleme na adresu obdarovaného, o nic se nestaráte.

Více informací

Více informací o knize Risk-Based Decision Model for Determining the Applicability of an Earned Value Management System in Construction

Nákupem získáte 165 bodů

Anotace knihy

New policy mandated by the Undersecretary of Defense for Acquisition, Technology and Logistics has lowered the dollar thresholds of contracts requiring earned value management (EVM). This policy directed that a risk-based decision be made to determine if EVM should be used on firm-fixed price contracts under $20 million. Although not previously applicable to Military Construction (MILCON) building projects or other Air Force Civil Engineer (CE) managed contracts, the new threshold requires that CE projects be evaluated for risk. Therefore, the focus of this research was to analyze the risk factors associated with construction contracts in an attempt to build a decision model to determine if EVM is warranted on the project. Due to the cost of implementing EVM, this model should probably be used only on Air Force construction projects with cost estimates over $5 million. If the cost growth predicted by the model is greater than 5%, the use of EVM is recommended to monitor the risk factors. However, this recommendation should be tempered with the overall risk associated with a given project. In other words, if the calculated cost growth is high but the probability of occurrence is low, the decision-maker may want to forego the use of EVM and the associated costs.

Parametry knihy

Zařazení knihy Knihy v angličtině Society & social sciences Education

1646

Oblíbené z jiného soudku



Osobní odběr Praha, Brno a 12903 dalších

Copyright ©2008-24 nejlevnejsi-knihy.cz Všechna práva vyhrazenaSoukromíCookies


Můj účet: Přihlásit se
Všechny knihy světa na jednom místě. Navíc za skvělé ceny.

Nákupní košík ( prázdný )

Vyzvednutí v Zásilkovně
zdarma nad 1 499 Kč.

Nacházíte se: