Kód: 17365132
On 6 April, drilling operations were continuing on the Well, and conductor casing had been set and cemented. While waiting on cement, the rig crew nippled down the diverter, cut the pipe, and welded on the casing head. The crew ri ... celý popis
Nákupem získáte 46 bodů
On 6 April, drilling operations were continuing on the Well, and conductor casing had been set and cemented. While waiting on cement, the rig crew nippled down the diverter, cut the pipe, and welded on the casing head. The crew rigged down the surface line
461 Kč
Osobní odběr Praha, Brno a 12903 dalších
Copyright ©2008-24 nejlevnejsi-knihy.cz Všechna práva vyhrazenaSoukromíCookies
Nákupní košík ( prázdný )