Kód: 13516144
In order to share some lesson learned / concluding remarks from the design and use of monobore completion configuration, many case studies have been discussed in the thesis to demonstrate the benefits of mono bore well completion ... celý popis
Angličtina
Nákupem získáte 73 bodů
Anotace knihy
In order to share some lesson learned / concluding remarks from the design and use of monobore completion configuration, many case studies have been discussed in the thesis to demonstrate the benefits of mono bore well completion and optimize the mono bore well completion according to the different reservoir parameters. The mono bore well completion is most economic in sense of less number of equipments used and low maintenance is required as compare to conventional completion. The mono bore well completion is most economic in sense of less number of equipments used and low maintenance is required as compare to conventional completion. Mono bore well completion enables to increase the production rate which intern meaning that it will reduce the long term operating cost and reservoir will depleted in shorter period of time.
Parametry knihy
732 Kč
Angličtina
Osobní odběr Praha, Brno a 46566 dalších
Copyright ©2008-26 nejlevnejsi-knihy.cz Všechna práva vyhrazenaSoukromíCookies
Vrácení do měsíce
571 999 099 (8-15.30h)Nákupní košík ( prázdný )