Risks that Cause Cost Overrun in Construction Projects / Nejlevnější knihy
Risks that Cause Cost Overrun in Construction Projects

Kód: 02988713

Risks that Cause Cost Overrun in Construction Projects

Autor Anas Mazen Abu Saad

The construction industry is major contributor in the economy of all countries. Effective cost performance is always main concern of any construction project. Its importance has been further increased after the economic recession. ... celý popis

1115 Kč


Skladem u dodavatele
Odesíláme za 5-8 dnů
Přidat mezi přání

Mohlo by se vám také líbit

Dárkový poukaz: Radost zaručena

Objednat dárkový poukazVíce informací

Více informací o knize Risks that Cause Cost Overrun in Construction Projects

Nákupem získáte 112 bodů

Anotace knihy

The construction industry is major contributor in the economy of all countries. Effective cost performance is always main concern of any construction project. Its importance has been further increased after the economic recession. Each construction project has different characteristics based on its location, function and objectives, which means that new projects hide new challenges to be faced by the construction parties. The success of a project is usually measured by delivering it within the required cost, time and quality, which are affected by number of risks and uncertainty sources. Some of these risks are related to global factors, while others are linked to the performance of project parties. This book aims to investigate major risks that cause cost overruns and delays in construction projects and gives recommendations about how to avoid, prevent and mitigate their effects. In addition, it analyses the implementation of risk management in the Jordanian construction industry. This book is considered different because it mainly covers complex private projects in Jordan, while others were based on public projects.

Parametry knihy

1115 Kč

Oblíbené z jiného soudku



Osobní odběr Praha, Brno a 48583 dalších

Copyright ©2008-26 nejlevnejsi-knihy.cz Všechna práva vyhrazenaSoukromíCookies


Můj účet: Přihlásit se
Všechny knihy světa na jednom místě. Navíc za skvělé ceny.

Nákupní košík ( prázdný )

Vyzvednutí v Balikovně a PPL
boxech
zdarma nad 1 499 Kč.

Nacházíte se: