Making the Expeditionary Aerospace Force Work--Now! / Nejlevnější knihy
Making the Expeditionary Aerospace Force Work--Now!

Kód: 08251173

Making the Expeditionary Aerospace Force Work--Now!

Autor William R Travnick

This paper proposes a definitive plan for the Aerospace Expeditionary Forces (AEF). The proposed plan briefly analyzes the current world situation, the evolving EAF "vision" spelled out by AF senior leadership, the challenges to t ... celý popis

1646


Skladem u dodavatele
Odesíláme za 14-18 dnů
Přidat mezi přání

Mohlo by se vám také líbit

Dárkový poukaz: Radost zaručena

Objednat dárkový poukazVíce informací

Více informací o knize Making the Expeditionary Aerospace Force Work--Now!

Nákupem získáte 165 bodů

Anotace knihy

This paper proposes a definitive plan for the Aerospace Expeditionary Forces (AEF). The proposed plan briefly analyzes the current world situation, the evolving EAF "vision" spelled out by AF senior leadership, the challenges to that vision, and where the EAF stands today. After reviewing the background, a definitive AEF plan based on the full EAF "vision" and our current force structure, complete with concept of operations and squadron-level tasking, is proposed. The AEF plan is divided into 4 separate areas: (1) 12 "paired" Combat AEFs, (2) 5 Bomber Alerts, (3) 5 MobilityAEFs, and (4) 12 "Normal Daily Taskings." Each area has assigned forces, planning factors, assumptions, and the concept of operations clearly spelled out. Following the proposed plan, the average tasked active duty squadron would be "on call" 93 days/yr; the average tasked ANG squadron would be "on call" 77 days/yr, and the average tasked AFR Command squadron would be "on call" 74 days/yr. After defining the plan, various scenarios for each "area" are analyzed. Several conclusions for current and future use of the AEFs are drawn. Finally, the paper puts the AEF plan and conclusions drawn from the scenarios together and compares what should happen to the AF's Operations Tempo (OPSTEMPO) and retention when the EAF "vision" is fully implemented. The result is a predicted actual OPSTEMPO of 48 days/yr for combat and combat support (flying) squadrons and 72 days/yr for airlift and tanker squadrons.

Parametry knihy

Zařazení knihy Knihy v angličtině Society & social sciences Education

1646

Oblíbené z jiného soudku



Osobní odběr Praha, Brno a 12903 dalších

Copyright ©2008-24 nejlevnejsi-knihy.cz Všechna práva vyhrazenaSoukromíCookies


Můj účet: Přihlásit se
Všechny knihy světa na jednom místě. Navíc za skvělé ceny.

Nákupní košík ( prázdný )

Vyzvednutí v Zásilkovně
zdarma nad 1 499 Kč.

Nacházíte se: